How to install SPC T-molding ?

T-Moldings are commonly used in doorways to join two  floors in adjoining rooms. Also recommended when making a transition from  floor to another floor that is approximately the same height.

Step 1

Install the flooring planks including the underlayment by

leaving a 1″-1.2” inch (25-30mm) gap for the installation

of the T-molding.

Step 2

Center the U-Track and Shim between the two vinyl floors and screw them to the sub floor by using screws.

Step 3

Gently press the molding into the track starting from one end to the other just like you would close a Zip-Lock bag.1”!!! Do not try to push the entire molding in all at once

by just pressing it in from top !!!

Consult Your Molding Experts

We help you avoid the pitfalls to deliver the quality and value you need, on-time and on-budget.

CONTACT US